Peak Scientific would recommend an IQ/OQ certification is performed at the following times:
• Equipment installation or relocation of the gas generator
• On a periodic basis in accordance with your standard operating procedures
• After a major repair
• Before a previously installed system is to be used in a regulated test environment for the first time
Can't find what you are looking for? Contact us here or phone your local tech support help centre.
Comments
0 comments
Please sign in to leave a comment.